Urban demolition works alongside older residential buildings with dust suppression in use

Who We Support

Monitoring on site, sorted practically

Contractors, site managers and project managers usually come to NVD for one of two reasons: monitoring equipment on site needs field work, or monitoring is required and the whole thing needs looking after.

Which route fits

You already have equipment, a consultant or a monitoring provider

NVD can carry out the field work on monitoring equipment specified or supplied by others: installation, fault attendance, power and connectivity problems, swaps, relocations and recovery — with a clear report of each visit.

Field services

You need the whole monitoring requirement looked after

Where the requirement is clearly defined, NVD can provide managed monitoring: equipment arranged, deployed and configured, kept operational, with alerts against agreed thresholds and reporting at agreed intervals.

Managed monitoring

Common situations

What usually prompts the call

If your situation is on this list, describing it in a few lines is normally enough to get a useful answer back.

A noise complaint or concern

Neighbours or a client have raised concerns about noise from the works and monitoring is now needed at agreed positions.

Demolition or piling starting

Works are beginning close to residential property or other sensitive receptors and monitoring needs to be in place before they start.

Vibration near sensitive structures

Heritage, listed or otherwise sensitive structures sit close to the works and vibration needs to be recorded against agreed project criteria.

Dust from excavation or earthworks

Dry conditions, material handling or earthworks have created dust concerns and monitoring is required at agreed locations.

Monitoring required by the project

A client, project specification or appointed specialist requires monitoring, and someone needs to deliver and run it practically.

An existing system offline

Monitoring equipment already on site has stopped reporting, lost power or connectivity, or been damaged and needs attendance.

Equipment to move or recover

Work fronts have moved, or the project is finishing and equipment and field infrastructure need removing properly.

Working with specialists

Alongside your appointed specialist where one is involved

Where a project requires specialist assessment, methodology, interpretation or limit-setting, NVD works to the requirements supplied by you or your appointed specialist, and handles the practical deployment, operation and reporting of the monitoring.

Tell NVD what the site needs

Send the location, what the works involve, what has prompted the requirement and any dates you are working to.